Point hebdomadaire

UTC

Présents: Senol, Sylvestre, Sylvain Leveque, Manon, Louis (ESO).

Project management:

  • How to share document, issue with people outside ESO
  • Find time to select the postdoc applicants
  • First level of the Product Tree
    • Possible to write first version of the cost estimate with 10% margin on well known parts, 20% on parts with uncertainty and 40% on parts we don't exactly know.
    • Exel file to be done on the local share @ LIRA
    • Try to indicate the needed date for the different parts

 

WP1 Metrology: Results on the bench, validation of the concept with optical reflexion, green light to continue on the concept.

TTR has to be written and integrated in the test plan to be done in Paranal. Location to install the optical source, need to know where to route the optical fibre, only day time activates. The optical fibre will be clamped along the road.

Action Amira/Mahias: Write the test plan

WP2 Beam Combiner: Meeting with VLC (sub-contractor). In a second step need to think about the mechanical packaging. 

 

WP3 Spectrometer: Meeting with OCA, need a feed-back to know if ressources are available. People in Garching to work on the mechanical design of the climatic chamber.

Philosophy: used COST components for the mechanical supports, list of parts for the climatic chamber almost done, COST optical components also can be used, need tolerance study to know how many and where mechanisms.

COST cryogenic chamber with Jubalo device, included vacuum pump, thermal control and cooling device.

Meeting today with FLI to address common questions with FLI

Action Tristan : See if ressources internal @ LIRA

 

WP5 ICS: First conceptual design of the control electronics

 

Action Lesteras : give ICS information to project.

Action Tristan : make the list of equipment to drive and how to interface with the specific ESO controller (Beckhof PLC) --> First concept with list of equipment.

              

 

 

Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide