Point Hebdomadaire
→
UTC
Présents: Amira, Jehanne, Wu, Mathias, Sylvestre, Manon, Elsa, Senol, Sylvain, Luis, Tristan
WP0: Management
- PhD Selection, 6 personnes, one already interviewed
- Last version of the Management Plan on the share: update of the cost, FTE and WP description
- Very first draft of the DCI: list of all the external interfaces.
WP1 Metrology: Metrology
- Amira wrote the test plan document, description of the test bench in Meudon and the test to be done at VLT
- Need to talk about the tests @ VLT with ESO team.
- Amira to send the document to ESO team to organise a meeting.
- Student will see the way to install the fiber at the telescope.
WP2 Beam Combiner:
- Add a mirror on a rotation stage, optimisation of the optical path
- Polarization adjustment with printed 3D parts
- Presentation of calibration data
WP3 Spectrograph:
- Meeting with FLI: step of the camera, need the right mechanical interfaces (ISO DIN 100)
- FLI will be late to deliver the full functional camera in time, decision to get 1 mechanical-thermal model (with electronics) in a first time to progress on AIT and then a complete camera to test the instrument before shipping to VLT
- Mass of the camera --> Placed on the top of the cryostat, see the impact on the optical design
WP4 Feeding optics:
- Dichroic on the instrument side (have to be defined)
- IF are clear, to see if optical correction is needed
WP5 ICS: RAS
WP6 System Test:
- What do we need in Meudon to mimic PIONER instrument ?
- Plan currently is not to replace all the PIONER instrument
WP7 Pipeline:
Other Business: