Point Hebdomadaire

UTC

Presents: Senol, Jehanne, , Wu, Sylvestre, Tristan

 

WP0: Management

  • Action Tristan : check if the last version of the project Management Plan is at the right place on the onedrive
  • ESO visit @ LIRA/Meudon the 19/20 March
  • Link between SHARPS and PLANETES, will be beneficial to the projet

 

WP1 Metrology: Metrology

  • Finalisation of the bench description document
  • Design of the box to manufacture
  • Results of PSD Phase Measurements on the bench
  • Have a specific meeting when Luis be back

 

WP2 Beam Combiner: 

  • Right alignment
  • Mechanical manufacturing
  • Possible to have PTV measurements to optimise the polarisation
  • Improvement on the performance of the code, put on the GitHub (nice :-) )
  • Next step polarisation control and PTV measurements (real time processing is not mandatory, but nicer !)
  • Test for Teams IO component, ask to glue the optical fibres on the component

 

WP3 Spectrograph:

  • Consolidate the opto-mechanical design 
  • Contact with French company for the cryostat
  • Action Tristan : update the requirements document with FLI 
  • See if wishes may be realised ;-)
  • Detector at ESO for test, Sylvestre to organise a meeting around the test plan, possible for PLANETES team to participate and discuss around that.

 

WP4 Feeding optics: 

  •  

 

WP5 ICS: RAS

  •  

WP6 System Test: 

  • First draft of ICD (check where is the document on the drive !)

 

WP7 Pipeline: 

 

Other Business:

  •  
Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide