Presents: Senol, Jehanne, , Wu, Sylvestre, Tristan
WP0: Management
- Action Tristan : check if the last version of the project Management Plan is at the right place on the onedrive
- ESO visit @ LIRA/Meudon the 19/20 March
- Link between SHARPS and PLANETES, will be beneficial to the projet
WP1 Metrology: Metrology
- Finalisation of the bench description document
- Design of the box to manufacture
- Results of PSD Phase Measurements on the bench
- Have a specific meeting when Luis be back
WP2 Beam Combiner:
- Right alignment
- Mechanical manufacturing
- Possible to have PTV measurements to optimise the polarisation
- Improvement on the performance of the code, put on the GitHub (nice :-) )
- Next step polarisation control and PTV measurements (real time processing is not mandatory, but nicer !)
- Test for Teams IO component, ask to glue the optical fibres on the component
WP3 Spectrograph:
- Consolidate the opto-mechanical design
- Contact with French company for the cryostat
- Action Tristan : update the requirements document with FLI
- See if wishes may be realised ;-)
- Detector at ESO for test, Sylvestre to organise a meeting around the test plan, possible for PLANETES team to participate and discuss around that.
WP4 Feeding optics:
WP5 ICS: RAS
WP6 System Test:
- First draft of ICD (check where is the document on the drive !)
WP7 Pipeline:
Other Business:
Il y a un compte-rendu associé à cet événement.
Les afficher.