Presents: Senol, Luis, Jehanne, Mathias, Amira, Manon, Tristan, Elsa, Luis
WP0: Management
- Go thru the minutes of the progress meeting for the various comments
WP1 Metrology:
- Discussions with Pierre-Bourgé @ Paranal, good to have FSM as an option, piezo control system baseline
- Check if possible to have 8m of harness between the electronic and piezo. If not --> Use FSM
- Discussion around the optical fiber routing
- Availability by end of July @ Paranal to help installing the hardware
- Need authorisation from ESO --> How ask ? Need short document to explain the fiber routing.
WP2 Beam Combiner:
- No news
- Laser source at the supplier to fix the problem
-
WP3 Spectrograph:
- Last version of Zemax conf, optimisation of the collimator with two achromatic COST doublets
- Very first mechanical implementation
- Action to have one unique document for all the spectrometer requirements.
WP4 Feeding optics:
- Nothing to say
- Piezo stage will be delivered to Pierre @ Paranal to check the mechanical IF
WP5 ICS:
WP6 System Test:
- On the TLR document remarks from Luis:
- Optical bandwidth
- Need link to the metrology system
- Where to put the components at the VLTI lab and on the PIONER bench ? Important to define the components.
WP7 Pipeline:
Other Business: