Leonardo Detector Status

UTC

Presents: Dan, Tristan, Gred and Neil

 

Detector Status@Leonardo

  • Batches by the summer
  • New version of the ROIC under test

See the global timeline here

 

  • Possible to optimise the AR coating for the science optical bandwidth
  • Dark will be measured on specific pixel with metallic mask (avoid any stray light) 
  • Novel ADP design: in 2-3 months from now first results (measurements on the wafer)
  • 6-10 arrays for the batch to choose the detectors (engineering and science)
  • Possible to run the output amplifier @ 3MHz, modelling of the noise-glow has been done by Leonardo --> Issue on the thermal load and glow principally
  • Data sheet of the ROIC will be procured in the next following weeks
  • Leonardo will send typical behaviour of the detector (defect versus gain, ...)

 

Packaging:

  • Need formal agreement between Leonardo and FLI
  • Need ICD and drawings from FLI --> Due date beginning of June
  • Use of package transportation box to send back the detector 

 

 

Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide