Presents: Luis, Tristan, Senol, Sylvestre, Manon, Mathias, Jehanne, Elsa, Elias, Samuel, Annes, Antoine, Zexuan
WP0: Management
- Comments from Senol about the PMP
- Possible to share it by the end of the week
- Presentation of the global schedule and associated reviews
- Top level scientific specifications document to be release
- Technical requirements to wok on
- ICD to work on
-
WP1 Metrology:
- First release of the document to be share soon
- Test setup to be clarified, the test plan to come next (need information from Paranal to know how it may/will append)
- Coordination between Luis and Amira
- No more information --> Waiting for the springs
- No news from Paranal for the routing of the optical fiber thru the telescope
WP2 Beam Combiner:
- Chip from ST the chip to be implemented with fiber by teemsphotonics --> JIRA ticket to follow the component :-) : Action Jehanne
- Polarisation studies on the test-bench: polarisation at the output of the fiber is not linear (probably due to the collimator and not to the fiber itself).
WP3 Spectrograph:
- Meeting with Christian about the Gravity design.
- Currently two custom designs --> See manufacturers to see what could be possible to build. Designs on the onedrive.
- Meeting with FLI to talk about the mechanical IF and the deliveries of the different models
- See if possible to have a smaller detector to integrate sonner or buy camera and make specific MGSE to mimic the final IF
-
WP4 Feeding optics:
- Have STEP file of the current design to test the concept here of the injection module with the piezo stages
WP5 ICS:
- Roberto to provide the WS
WP6 System Test:
- Discussion about what to build to mimic PIONER @ LIRA for system test
- Options:
- Built injection part only
- Need to demonstrate in lab the high contrast: Need piezo, TT, ... to reproduce part of the injection in PIONER
WP7 Pipeline:
WP11: System Engineer
Other Business: Nothing.