Point hebdomadaire
→
UTC
Presents: Luis, Tristan, Amira, Mathias, Jehanne, Elsa, Zexuan, Sylvestre, Antoine (Ménard), Senol, Luis, Elias, Hugo
WP0: Management
- See if possible to have a teams visio link in the LIRA meeting room
- A lot of comments inside the PMP, LIRA makes a release of the doc --> Next step to put the doc in the ESA PDM
- PMP --> Signed the pdf @ LIRA and send to ESO
- Tristan expects to visit ESO by June to talk also with Derek about the detector
- Overview document on-going.
WP1 Metrology:
- Meeting postponed to Wednesday the 27th of May
- Documentation on-going
- Preparation of the test to inject the laser with the mechanical support and the piezo-mike
- Test will begin soon (1 hour !)
WP2 Beam Combiner:
- Next step to send the component to put the optical fiber
WP3 Spectrometer:
- Update of the conceptual document for the thermal architecture.
- P. Berger send drawing to show possible implementation on the PRIMA optical table
- Needs drawings to put inside the ICD document
- Optical design with two different material of the components.
- Manon asked provider to have some --> Wait the answers from them.
- The design may be seen by opticians @ LIRA to have advises.
WP4 Feeding optics:
- Where is the pupil in the VLTI lab ? --> Need to put inside the ICD
- Different options for the instrument implementation inside the VLTI lab
- Alignment issues for the injection optics.
WP5 ICS:
- Add of Ethernet communication IF for the piezo-stages (x4)
WP6 System Test:
- Nothing to say
WP7 Pipeline:
- Nothing to say
WP11: System Engineer
Other Business: Nothing.