WP0: Management

  • See if possible to have a teams visio link in the LIRA meeting room
  • A lot of comments inside the PMP, LIRA makes a release of the doc --> Next step to put the doc in the ESA PDM
  • PMP --> Signed the pdf @ LIRA and send to ESO
  • Tristan expects to visit ESO by June to talk also with Derek about the detector
  • Overview document on-going.

 

WP1 Metrology

  • Meeting postponed to Wednesday the 27th of May
  • Documentation on-going
  • Preparation of the test to inject the laser with the mechanical support and the piezo-mike
  • Test will begin soon (1 hour !)

 

WP2 Beam Combiner: 

  • Next step to send the component to put the optical fiber
  •  

 

WP3 Spectrometer:

  • Update of the conceptual document for the thermal architecture.
  • P. Berger send drawing to show possible implementation on the PRIMA optical table
  • Needs drawings to put inside the ICD document
  • Optical design with two different material of the components.
  • Manon asked provider to have some --> Wait the answers from them.
  • The design may be seen by opticians @ LIRA to have advises.

 

WP4 Feeding optics: 

  • Where is the pupil in the VLTI lab ?  --> Need to put inside the ICD
  • Different options for the instrument implementation inside the VLTI lab
  • Alignment issues for the injection optics.

 

WP5 ICS: 

  • Add of Ethernet communication IF for the piezo-stages (x4)
  •  

 

WP6 System Test: 

  • Nothing to say

 

WP7 Pipeline: 

  • Nothing to say

 

WP11: System Engineer 

  •  

 

Other Business: Nothing.

  •  

 