Point hebdomadaire
→
UTC
Presents: Luis, Tristan, Amira, Mathias, Jehanne, Elsa, Zexuan, Sylvestre, Elias, Hugo
WP0: Management
- PMP on the ESO documentation system (PDM)
- ESO Latex template compatible with the ESO PDM
- Last version of Metrology document ready for ESO PDM
- All documents inside the "Document" folder for each WP
WP1 Metrology:
- Target date for first installation of the system @ Paranal --> November 2026
- Alignment of the optical fiber with the metrology device (piezo-mike and mechanical parts)
- Use of the Redpitaya to acquire the flux on the photodiode
- Make a second iteration with plastic parts and then if it works make the final configuration (metal part)
- Choose the collimator --> Fix or variable focal length
- Optical fiber procurement on-going
- Polarisation issue --> Work on software on-going
WP2 Beam Combiner:
- Test-bench: work on polarisation, issue with Argon source (no flux at the output)
- Keep in mind that we need a specifications document for the call for tender
WP3 Spectrometer:
- Issue on Zemax license @ ESO :-(
- Tolerancing of the current design on-going @ ESO
- FLI discussions --> Action Tristan: organise a meeting with FLI to find the best design
- Cryostat --> Action Elias: Begin the first draft of a call-for-tender like document
- Tristan visit Derek @ ESO to discuss on detector test and performance
WP4 Feeding optics:
- Decide the strategy to continue on the injection module developement --> Discussion inside the planetes office
- Work to be done on alignment (where ?)
WP5 ICS:
- Roberto get a new computer for the Metrology system
- Need of a new Redpitaya --> No TBC
WP6 System Test:
- Nothing to say
WP7 Pipeline:
- Nothing to say
WP11: System Engineer
- Luis and Tristan on the ICD
- Sylvestre on the instrument overview document
Other Business: Nothing.
Il y a un compte-rendu associé à cet événement.
Les afficher.
L'ordre du jour de cette réunion est vide