Point hebdomadaire

UTC

Presents: Luis,  Tristan, Amira, Mathias, Jehanne, Elsa, Zexuan, Sylvestre,  Elias, Hugo

WP0: Management

  • PMP on the ESO documentation system (PDM)
  • ESO Latex template compatible with the ESO PDM
  • Last version of Metrology document ready for ESO PDM
  • All documents inside the "Document" folder for each WP

WP1 Metrology

  • Target date for first installation of the system @ Paranal --> November 2026
  • Alignment of the optical fiber with the metrology device (piezo-mike and mechanical parts)
  • Use of the Redpitaya to acquire the flux on the photodiode
  • Make a second iteration with plastic parts and then if it works make the final configuration (metal part)
  • Choose the collimator --> Fix or variable focal length
  • Optical fiber procurement on-going
  • Polarisation issue --> Work on software on-going

 

WP2 Beam Combiner: 

  • Test-bench: work on polarisation, issue with Argon source (no flux at the output)
  • Keep in mind that we need a specifications document for the call for tender

 

WP3 Spectrometer:

  • Issue on Zemax license @ ESO :-(
  • Tolerancing of the current design on-going @ ESO
  • FLI discussions --> Action Tristan: organise a meeting with FLI to find the best design
  • Cryostat --> Action Elias: Begin the first draft of a call-for-tender like document
  • Tristan visit Derek @ ESO to discuss on detector test and performance

 

WP4 Feeding optics: 

  • Decide the strategy to continue on the injection module developement --> Discussion inside the planetes office
  • Work to be done on alignment (where ?)

 

WP5 ICS: 

  • Roberto get a new computer for the Metrology system
  • Need of a new Redpitaya --> No TBC

 

WP6 System Test: 

  • Nothing to say

 

WP7 Pipeline: 

  • Nothing to say

 

WP11: System Engineer 

  • Luis and Tristan on the ICD
  • Sylvestre on the instrument overview document

 

Other Business: Nothing.

  •  

 

Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide