Presents: Luis,  Tristan, Amira, Mathias, Jehanne, Elsa, Zexuan, Sylvestre,  Elias, Hugo, Elsa, Antoine

WP0: Management

  •  

WP1 Metrology: 

  • Piezo working, possible to align by finding the max intensity 
  • Tested with 12 meters cable length
  • Need new moving plate-form (prototype today, quotation for metal part)
  • On-going activities to insulate the bench
  • Polarisation control missing, activities on-going: alignement of OAP, software for polarisation of the VLT
  • Component procurement on-going to update the bench
  • Design will be reviewed by ESO

 

WP2 Beam Combiner: 

  • Argon source too faint to make measurements: need spectral lines to calibrate 
  • Mainly working on the SPIE paper :-)

 

WP3 Spectrometer:

  • Optical tolerances on-going
  • Possible to have support @ ESO to work on Zemax-Python for optimisation
  •  Cryostat: no news
  • Camera: Meeting with FLI to agree on the mech IF 
  • Leonardo: Meeting to follow the batch procurement

 

WP4 Feeding optics: 

  • Add Ethernet connection for the piezo-stage control 
  • Possible to use USB connection for preliminary test
  •  

 

WP5 ICS: 

  • Meeting with technical department of Paris Obs for hardware 
  • Meeting foreseen with Gérard Zens @ ESO

 

WP6 System Test: 

  • Nothing to say

 

WP7 Pipeline: 

  • Nothing to say

 

WP11: System Engineer 

  • For the ICD: two different documents one for the external IF managed by ESO and one the internal IF managed by LIRA
  • We have the procedure to produce documentation for the ESO PDM, need to discuss with Senol to decide about the structure of the PDM

 

Other Business: Nothing.

  • RAS

 

Il y a un compte-rendu associé à cet événement. Les afficher.