Point hebdomadaire
→
UTC
Presents: Luis, Tristan, Amira, Mathias, Jehanne, Elsa, Zexuan, Sylvestre, Elias, Hugo, Elsa, Antoine
WP0: Management
WP1 Metrology:
- Piezo working, possible to align by finding the max intensity
- Tested with 12 meters cable length
- Need new moving plate-form (prototype today, quotation for metal part)
- On-going activities to insulate the bench
- Polarisation control missing, activities on-going: alignement of OAP, software for polarisation of the VLT
- Component procurement on-going to update the bench
- Design will be reviewed by ESO
WP2 Beam Combiner:
- Argon source too faint to make measurements: need spectral lines to calibrate
- Mainly working on the SPIE paper :-)
WP3 Spectrometer:
- Optical tolerances on-going
- Possible to have support @ ESO to work on Zemax-Python for optimisation
- Cryostat: no news
- Camera: Meeting with FLI to agree on the mech IF
- Leonardo: Meeting to follow the batch procurement
WP4 Feeding optics:
- Add Ethernet connection for the piezo-stage control
- Possible to use USB connection for preliminary test
WP5 ICS:
- Meeting with technical department of Paris Obs for hardware
- Meeting foreseen with Gérard Zens @ ESO
WP6 System Test:
- Nothing to say
WP7 Pipeline:
- Nothing to say
WP11: System Engineer
- For the ICD: two different documents one for the external IF managed by ESO and one the internal IF managed by LIRA
- We have the procedure to produce documentation for the ESO PDM, need to discuss with Senol to decide about the structure of the PDM
Other Business: Nothing.
- RAS
Il y a un compte-rendu associé à cet événement.
Les afficher.
L'ordre du jour de cette réunion est vide