Point hebdomadaire

→ UTC

Presents: Jehanne, Amira, Luis, Sylvestre

 

WP0:

Senol email --> Progess meeting September 19th.

Make an agenda with status of the work done and to be done in the next six months for all the project WPs. A/2 day (afternoon) by remote.

WP1: Metrology

Documentation, interactions with Paranal team by mid-September. Senol asked for official support at Paranal.

Risk register matrix to comment, add item if needed. The document is on the ESO-onedrive.

Have a look at the interface, electrical needs for the different components: complet the technical note

Action Tristan: fill the technical note for the electrical needs.

Need information of the fiber coupler --> Action Luis

Procurements:

  • Optical fiber, Amira checked to the company.
  • Receiver under procurement
  • IF to the spider --> Action Sylvestre: Find the drawings (see the PDM Gravity)
  • New control electronics for the Piezo-mike under procurement (Ethernet and USB com interfaces).

Nov run:test the propagation of the beams, the onto-mech interfaces. See if a duplication of the Metrology bench is needed between the two runs (Nov and January).

Roberto (ESO) get a RedPytaya, need to access the GitHub for the code (developed by Mathias.

WP2: Bench & Beam Combiner

Bench: wait some equipment. Test a new concept of polarisation control. Contact with IRAP to develop a collaboration, objective to give them a full WP (WP2 would be an opportunity).

Time to dress the issue of the double injection module. Pierre to give us the design of the double injection module.

Read the document call-for-tender --> Organise a meeting 

Procurement of the Argon source on-going.

Need a trace-off to decide if or not used an ADC --> OK let's do it ! This will be presented to IRAP.

 

WP3: Spectrometer.

Elias working on the report now. Organisation of its work in September in Meudon.

FLI/Leonardo nothing particular to report, things progressed well.

Need meeting on the flange of the Cred-XL with FLI in September.

 

WP4: Feeding optics

Nothing to report.

WP5: ICS

Draft of the ICS design.

WP6: System

Nothing to report

WP7 : Pipe-Line

 

 

 

 

Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide