Point hebdomadairre

→ UTC

Presents: Jehanne, Amira, Luis, Sylvestre

 

WP0: Management

Meeting next week with IRAP to be involved in the opto-mechanical design of the bench

Agenda for the progress meeting of the 29th September.

Action everyone: check the agenda

 

WP1: Metrology

Update documents versus demands from Paranal, how to split the tests. Check how to unmount the receiver part if there is any disturbance of the observation.

Senol plan to have a meeting with Paranal next week. 

26th of September procurement, 2 days test and send to ESO-Garching. See if possible to test on a longer period.

Foam received to insulation, wait the frame and aluminium panels to mount everything. 

Amira wait Mathias go to order large list @ Thorlabs for the Metrology and Beam Combiner.

 

WP2: Bench & Beam Combiner

Test on polarisation by Jehanne: more stable and robust mechanical mounting. Issue on polarisation, not possible to reach zero flux. Stages have move around 15cm, see how the number of spires acts on the polarisation. 

See if need specific mechanical parts.

Hugo work on the alignment of the bench, wait for the laser.

WP3: Spectrometer.

Meetings with:

  • Leonardo to follow the detector developmeent
  • FLI to work on the IF

 

WP4: Feeding optics

No news.

 

WP5: ICS

No news.

 

WP6: System

Action Tristan: Add the sources conceptual design of the calibration sources on the onedrive document system.pptx 

 

WP7 : Pipe-Line

No updates

 

 

 