Point hebdomadaire

→ UTC

Present: Amira, Mathias, Cynthia, Senol, Luis, Samuel, Antoine, Jens & Tristan

 

WP0: Management

Think about the progress report.

Meeting planned with Paranal

Take a look at the exel file for the action

Nice with the template sent by 

 

WP1: Metrology

Delivery of the optical fiber expected in Dec, but difficult to guaranty due to other delivery.

Fibers to send directly to Paranal and test on one fiber in lab. Need to test all the segments of the fiber before sending ? Some tests will be done by the manufacturer after connectarisation.

Need to have information for the work of Paranal one month before.

Second or third week of November to have consolidation of the optical fiber delivery.

Amira to write exel file to define the list of thing to send

Final receiver to integrate this week, parts in workshop for the last modifications.

Need to built a new version of the Metrology beam combiner, delivery by end of November

Metrology WS meeting

 

WP2: Beam Combiner

Documents to define IRAP work under work (Polarisation control and Double injection module)

Document for the beam combiner IO component under work, send to CNRS by mid-November

Bench status: no news. Argon lamp too weak, injection to check.

Meeting with Pierre @ Paranal on the injection bench this week for new design.

 

WP3: Spectrometer

Call for tender document for the cryostat

Optical design frozen, need the tolerancing and identified suppliers.

Need to check if VEMO design fit to Planetes constraints

ESO test stop due to temperature issue. Paper from CEA, visit expected this week.

 

WP4: Feeding optics

See WP2 for IRAP work definition

 

WP6: System test

Document on high level technical specifications to work on it

Possible internship and PhD to work on integration and test bench in Meudon

 

WP7: Pipeline

Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide