Point Hebdomadaire

→ UTC

Presents: Cynthia, Amira, Jehanne, Senol, Sylvestre, Tristan, Elsa, Zexuan

 

WP0: Management

Progress Report in Draft partially done by Claude-IA-Agent.

Leonardo and FLI to give update of schedules for the Detector and Camera delivering.

Action Tristan/Sylvestre: Project Cost to update 

Next progress meeting in third weeks of January

 

WP1: Metrology

Luis email about the shipment for the Metrology Test

New mechanical part for the Metrology receptor, maximum flux found (but tricky because the springs are too small and there is no reference for the piezo), high hysteresis for the piezo deplacement. Need to check the optical fiber radius of curvature versus the M1 spider mechanical interface.

Action: Issue on the optical fiber output of the receiver

Photodiode under procurement

WP2: Beam Combiner

ABCD coherence measurements on the bench.

Ask for cotation for polarimeters (Cynthia and Jehanne)

 

WP3: Spectrometer

Answers for NightOptics (Uk) for quotation for the collimation optics.

VPH+Prism done by INAF (?): may be will do the integration of the different components, LIRA will provide Prisms and bulk material for the VPH. Need to agree on mechanical IF.

Mechanical meeting with LIRA for dimensioning of the mechanical support.

Some delay expected for the packaging @ FLI.

Need to have a test camera for the optical alignment, need to have specific mechanical IF with the Cryostat-Spectrometer

Call for tender for the Crysotat procurement with a schedule validated, reply to the call in January, delivery in September.

 

WP4: Injection Bench

Document to IRAP, plan a meeting by mid-November 

New design of the Dual Injection Module done Pierre Berger

 

WP5: ICS

Write a requirements document for the UNIDIA to make the design of the final system

Need meeting with Mathias and Amira (+Tristan)

 

WP10: Pipeline

 

 

Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide