WP0 Management

  • Progress report on-going, schedule to be consolidated, one for the global projet & one per each WP.
  • Send invitation and agenda for the next progress meeting. People form ESO Tech-Dev department to addend to the meeting. TTR activities with ESO@Paranal people. Discussions on-going for the Metrology test next year.

 

WP1 Metrology

  • New receiver part under test on the bench. 
  • Polirazier procurement on-going, collimator 2 in lab.
  • Cover to protect the bench under construction 
  • Optical fiber for sending to Paranal received in Meudon --> TBC
  • Expedition 12th of February, possible on the 8th of December.
  • Path for the connexion on the spider may be longer. See the maximal cable length 18m
  • Discussion around the Interlock. Laser IF to be send, standard IF.
  • WS Metrology should arrived soon.  
  • June and Nov 2027 for the test on two UTs

Action Luis: Give an estimation of the piezo-mike cable length needs 

 

WP2 Beam Combiner

  • Polarimeter procured, wait to some components, fibers received
  • Start STChip characterisations next week.

 

WP3 Spectrometer.

  • Tolerancing on-going.
  • Estimation of defocus
  • Manufacturer proposed different material for the Lens.
  • Information on Thorlabs Lens about vacuum-Temp, tests expected under environment conditions @ ESO.
  • Feedthrough done @ SEDI company.
  • FLI will deliver the detector packaging by 1.5 month, to delay the detector and camera procurement.

 

WP4 Injection Bench

  • New design sent by Pierre, prototype will be tested, next year for the design and procurement of the final model.
  • Discussions with IRAP on the documents sent for clarification.
  • Need to get sub-systems from Pioner for the instrument integration in Meudon, need synchronisation between the activities. All duplicate will be very expensive.
  • Beam selection: dichroics. Need clarification for the work done @ ESO and project. Requirements for dichroic as a good starting point.

 

WP5 ICS.

  • New version of the Design Report: new stage on the double injection module and final Metrology board requirements.
  • Work @ UNIDIA on stratégy of PI control and call-for-tender for the final Metrology control electronic

 

WP6 Pipe-line

  • Some test last week.

 

 

 

 