Point hebdomadaire

UTC

Presents: Senol, Jehanne, , Wu, Mathias, , Amira, Manon, Sylvestre, Tristan, Elsa, Elias

 

WP0: Management

  •  

 

WP1 Metrology

  • Action Amira : Thorlabs order to be done
  • Error budget 

 

WP2 Beam Combiner: 

  • Polarisation control: test on-going on the bench by Jehanne
  • Test of integrated components by Amira in Grenoble @TeamsPhotonics, see slides for results (good transmission)

 

WP3 Spectrograph:

  • Gravity collimator as baseline, introduces aberration, need to change material
  • Focusing optics with diffraction limited with 2 achromatic doublets (Thorlabs)
  • Thursday at 16h every week meeting on the Opto-mechanical design
  •  

 

WP4 Feeding optics: 

  • CEDRAT plateforme @ LIRA
  •  

 

WP5 ICS: 

  • RAS
  • Pioner decommissioning before installing PLANETES --> Impact on the ICS
  •  

 

WP6 System Test: 

  •  

 

WP7 Pipeline: 

  •  

 

Other Business:

  •  
Il y a un compte-rendu associé à cet événement. Les afficher.
L'ordre du jour de cette réunion est vide