Presents: Senol, Jehanne, , Wu, Mathias, , Amira, Manon, Sylvestre, Tristan, Elsa, Elias
WP0: Management
WP1 Metrology:
- Action Amira : Thorlabs order to be done
- Error budget
WP2 Beam Combiner:
- Polarisation control: test on-going on the bench by Jehanne
- Test of integrated components by Amira in Grenoble @TeamsPhotonics, see slides for results (good transmission)
WP3 Spectrograph:
- Gravity collimator as baseline, introduces aberration, need to change material
- Focusing optics with diffraction limited with 2 achromatic doublets (Thorlabs)
- Thursday at 16h every week meeting on the Opto-mechanical design
-
WP4 Feeding optics:
WP5 ICS:
- RAS
- Pioner decommissioning before installing PLANETES --> Impact on the ICS
-
WP6 System Test:
WP7 Pipeline:
Other Business:
Il y a un compte-rendu associé à cet événement.
Les afficher.