Progress meeting
Minutes of the progress meeting 29th September 2026
Presents: Senol, Sylvestre, Jens, Luis, Samuel, Amira, Jehanne, Elsa, Mathias, Tristan, Roberto
Senol.
- General news of the project.
- Metrology test posponed —> Feb 2027
- Progress in design.
- New people in ESO team: 2 x Post-Doc arriving in the next months
- Metrology test preparation TTRs documents by end of October-2026
- SDR/PDR posponed begining of 2027
- Need to update the schedule of the WP with more granular view.
Action to each WP responsible:
- See slide 7 of Senol presentation to built the next progress report.
- New progress to be written by end of November
- Built a realistic schedule
Sylvestre.
- Top-Level Requirements document and science cases
- Metrology work-station can work without the instrument
- Instrument overview
- Metrology WS algorithms and IF
- Hardware from PIONIER not before 2028
Action Sylvestre: Organise a specific meeting for the Metrology WS setup.
Mathias & Amira for the Metrology ;-)
- Presentation of the metrology concept
- Injection module inside the instrument
- Position control is more optical alignment --> To put inside the Metrology WS to have a stand-alone system.
- Better to bring everything to Meudon to make a global test of the system, need the long optical fiber.
- RedPytaya and Scope only used for the first test
- For the first prototype test --> Do not use any polarisation control
- Easy beam combiner easy to build for monochromatic beam
- Power and noise budget. Info on Laser frequency noise.
- Presentation of the metrology bench and noise injection to mimic and retrieve the vibration information
- Procurement of the bench components on-going, expected to have all in the following weeks.
- Need specific part to attach the receiver.
- Receiver safety has been checked by Markus @ ESO-Garching, but need a double check from ESO-Paranal
- Dead-line to send the optical fiber to Paranal, check is compatible with the optical fiber procurement
Action Luis: Need to clarify the interaction with Gravity during the metrology test.
Action Tristan: Write a technical note on the receiver parts for security and AIT check @ Paranal
Luis on Metrology test
- CCB & TTR Status, schedule of the metrology prototype test/validation
- Consolidation of the time-line @ Paranal
- Some IF have to be checked.
- Test on AT is considered but not at the moment ;-), let's focus on the UT
Action Luis: Prepare a check (or wish ? ;-) )list for mid-November
Action Mathias: For the test expected in summer 2027, do we need a specific electronic board or do we use multiple RedPytaya/Scope ? If specific board needed the work on it has to begin soon...
Tristan
Jehanne.
- Test bench to simulate the VLTI --> Optimisation of the fringes contrast
- Test of Gravity setup to control the polarisation --> Sensitive to optical fiber geometry configuration
- Test of "spring-like" setup --> More robust by bi-refringence observed (TBC) inside the optical fiber
- Next steps to understand the "bi-refringence" on specific setup of the bench trying to induce this effect
Amira
- Teamphotonics will realise all the beam combiner components we need ;-)
- Characterisations of the chip --> Transmission
- Beam combiners: one for the planets and one for the star
- Phase shift under study --> Issue on people at the company put the PLANETES chip in stand-by
- Metrology chips under realisation.
Conclusion
- Focus on key milestones for the metrology
- Progress report: Risks, schedule, expected actions/works (template from Gravity as exemple)
- List of critical components and IF
Action Tristan/Sylvestre: Make an update of the cost of the instrument