Point hebdomadaire
Present: Amira, Mathias, Cynthia, Senol, Luis, Samuel, Antoine, Jens & Tristan
WP0: Management
Think about the progress report.
Meeting planned with Paranal
Take a look at the exel file for the action
Nice with the template sent by
WP1: Metrology
Delivery of the optical fiber expected in Dec, but difficult to guaranty due to other delivery.
Fibers to send directly to Paranal and test on one fiber in lab. Need to test all the segments of the fiber before sending ? Some tests will be done by the manufacturer after connectarisation.
Need to have information for the work of Paranal one month before.
Second or third week of November to have consolidation of the optical fiber delivery.
Amira to write exel file to define the list of thing to send
Final receiver to integrate this week, parts in workshop for the last modifications.
Need to built a new version of the Metrology beam combiner, delivery by end of November
Metrology WS meeting
WP2: Beam Combiner
Documents to define IRAP work under work (Polarisation control and Double injection module)
Document for the beam combiner IO component under work, send to CNRS by mid-November
Bench status: no news. Argon lamp too weak, injection to check.
Meeting with Pierre @ Paranal on the injection bench this week for new design.
WP3: Spectrometer
Call for tender document for the cryostat
Optical design frozen, need the tolerancing and identified suppliers.
Need to check if VEMO design fit to Planetes constraints
ESO test stop due to temperature issue. Paper from CEA, visit expected this week.
WP4: Feeding optics
See WP2 for IRAP work definition
WP6: System test
Document on high level technical specifications to work on it
Possible internship and PhD to work on integration and test bench in Meudon
WP7: Pipeline